The L110 bus route adapts for transfer with L9
22 de March de 2016
From 22 March, TMB will change the route of the 110-bus line (metro Carrilet – Polígon Industrial Zona Franca) financed by El Consorci and CILSA. The bus route will add two new stops to connect with the Parc Logístic metro station served by Line 9 South. + INFO